The description and location of the project is as follows: For the improvement of certain sections of STATE HIGHWAY in MCKEAN, POTTER, AND CAMERON COUNTY, VARIOUS BOROUGHS AND TOWNSHIPS, Commonwealth of Pennsylvania, Group 2-26- RAR3.For the repair or replacement of guide rail, bridge railing, and appurtenances damaged by traffic, and for new guide rail installation for safety updates on various state routes in MCKEAN, POTTER, AND CAMERON COUNTY. Item Work Class Code Unit Of Measure Quantity Unit Price PDP Spec Prov 0619-0450 J3 Each 3.0000 N PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, FLARED (MASH) 0619-0459 J1, J3 Each 23.0000 N PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, TANGENT (MASH) 0619-0730 J3 Each 3.0000 N PERMANENT IMPACT ATTENUATING DEVICE, TYPE IV, TEST LEVEL 3, (MASH) 0619-0744 J3 Each 3.0000 N PERMANENT IMPACT ATTENUATING DEVICE, TYPE V, TEST LEVEL 3, MASH, WIDTHS LESS THAN OR EQUAL TO 36 INCHES 0620-0400 J Each 11.0000 N TERMINAL SECTION, SINGLE 0620-0500 J Linear Foot 600.0000 N RESET GUIDE RAIL 0620-0503 C1, J Linear Foot 4,000.0000 N REMOVE EXISTING GUIDE RAIL (CONTRACTOR'S PROPERTY) 0620-0543 J Each 3.0000 N GUIDE RAIL STRONG POST, 7' LENGTH 0620-0544 J Each 3.0000 N GUIDE RAIL STRONG POST, 8' LENGTH