1. Process and Procedure: a. Removal of vanity b. Demo and removal of existing floor coverings, including damaged subflooring c. Replace the subfloor and repair any damaged floor joists d. Replace underlayment e. Apply adhesive f. Cut and install new LVT or LVP flooring (HACP Sr. Project Manager to determine) g. Install new cove base and transition strips h. Reset the vanity i. Re-caulk to seal at shower/bathtub and vanity as needed 2. Requirements: a. Any/All materials are to be removed by contractor and areas should be left clean of dust, materials, and debris b. Work area to be left in a clean and safe condition c. All debris must be removed from the site and disposed of by Contractor. No debris to be placed in HACP trash receptacles...