The work under this Contract shall generally consist of, but not necessarily be limited to, paving repairs to a portion of Fisher Ave. (+/-3,150 LF x 62’ wide), milling and replacing 2” depth of bituminous road surface, replacing all line painting, saw cutting and tying into exg. roads & parking areas and full depth repairs (500 LF x 12’ wide). The contractor will be required to maintain single lane traffic, both directions, during the duration of the project. Additionally, the Ft. Indiantown Gap Fire Dept. and Police Dept. will need to remain available for emergencies on the post 24 hrs. a day, 7 days a week, and emergency access to the airfield, potentially requiring temporary paving, phasing the work in front of these facilities, as well as ensuring unimpeded access to the airfield.