This requirement is for the repair of the items herein this solicitation.\\
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement
is measured from asset Return to the date of asset acceptance under the terms
of the contract. For purposes of this section, return is defined as physical receipt
of the F-condition asset at the contractor’s facility as reflected in the Action Date
entry in the commercial Asset Visibility (CAV) system. In accordance with the CAV
Statement of Work, the contractor is required to accurately report all transactions
by the end of the fifth regular business day after receipt and the Action Date
entered in CAV must be dated to reflect the actual date of physical receipt. \\
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.\\\\\\\
Required RTAT: ## ____ days after receipt of asset.\\
Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. \\
Reconciliation: A reconciliation modification will be issued after final
Inspection and acceptance of all assets inducted under the subsequent
contract. The parties have agreed to a price (shown on the schedule page of
the contract) for each unit at the negotiated RTAT. Such prices are based on
the Contractor meeting the RTAT requirements described within the schedule
page. If the Contractor does not meet the applicable RTAT requirement,
consideration will be assessed and subject to negotiation.
\\\\\\\\\\\\\\\
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral