Please note that this opportunity is hosted on the Bonfire platform. For further information, please see the associated URL. Specifications include, but are not limited to: The primary scope of work for this project includes grading and stabilizing the streambank of a property along the Paunnacussing Creek. The project will be completed to the standards of the USDA-NRCS design and specifications. The scope includes installation of ~227 feet of R-7 Riprap installed to top of bank at the design slope of 1.5:1, with a variable bank height. Bank sloping is required at a design slope of 1.5:1. Extend existing storm water pipe to the face of the proposed rock. Remove approximately a 24' wide x 230' long gravel bar, 2' high. Removal of gravel bar material, to within 6" of normal water level. Other components include access development, rock construction access, erosion and sedimentation control, tree removal, and site restoration. Chapter 105 Clean Streams Law GP-3 permit has been registered with PA DEP.