This project provides for the furnishing of all labor, material, equipment, and work necessary for the replacement of an existing single span steel girder bridge with a two span, prestressed bulb-tee bridge. Work also includes the reconstruction of T-501 (Marsh Road) and T-400 (Adams Road), utility installations, drainage modifications, installation of compost sock sediment traps, construction of stormwater basins, and maintenance and protection of traffic. Work items include, but are not limited to: 41,458 CY Excavation, Various Types 7,166 TON Superpave Asphalt Mixture, Various Courses, Various Mixes 19,342 SY Milling of Asphalt Pavement Surface, Various Depths 5,734 SY Subbase (No. 2A), Various Depths 1,646 LF Drainage Pipe, Various Sizes and Types 16 EA Inlets/End Sections/Endwalls 1,075 LF Guide Rail, Various Types 4,921 LF Temporary Concrete Barrier/Glare Screen 127,030 LB Reinforcement Bars, Plain and Epoxy Coated 1,080 LF Steel Beam Bearing Piles, HP12x53 938 CY Cement Concrete, Various Classes 1,241 CY Selected Borrow Excavation, Structure Backfill 665 LF Prestressed Concrete PA Bulb-Tee Beams