All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: BITUMINOUS PAVING - Complete all testing in accordance with PENNDOT Specifications Form 408 Section 413 - Tack Coat is required per Section 460 of PennDOT Specifications Form 408 and is incidental to paving. - Bituminous Seal on all abutting pavement and curbs required and is incidental to paving. - Saw cut or milled paving notches required and are incidental to paving. - Milling of driveway notches are to be done as directed and in a fashion that maintains the shoulder slope and provides a smooth transition from the driveways to the shoulder. - Contractor to provide PennDOT approved bituminous mix design which meets PennDOT Specifications Form 408 to the Municipality 5 days prior to the start of work. - Bituminous Delivery tickets must contain the Job Mix Number (CAMMS No.) from the appropriate bituminous design. - Bituminous Material Certifications must contain the Job Mix Number (CAMMS No.) from the appropriate bituminous design. - The final cross-section for roadways shall have a uniform crown of ¼ inch per foot, subject to the tolerances of PennDOT Specifications Form 408, except where super-elevated or where otherwise directed. 9.5MM WEARING COURSES - The scope of the work is to construct a paver laid Bituminous Wearing Course over an existing Bituminous Roadway, placement includes miscellaneous road preparation, milling of pavement notches and milling of driveways, tack coating, and sealing of joints and utilities. The Municipality may direct the contractor to place hand or machine place roll bituminous curb, placement of this curb will be included in the paving cost. These items are incidental to the paving. MILLING - The Contractor is to mill roads as directed. The milled material is the property of the Contractor and the Contractor is responsible for the proper disposal of milled materials. The Contractor will be responsible for following the Reclaimed Asphalt Pavement (RAP) Industry-Wide Co-products Determination for the storage and use of the RAP Materials...