Specifications include, but are not limited to: To follow all DEQ and OSHA guidelines, remove and dispose of asbestos containing fiber board per PBS report. To include Asbestos Specific general liability insurance, DEQ notification, Clearance testing, Air Monitoring, Transportation manifest and dump fees. Remove approximately 4100 SF of Fiber board Asbestos Containing Materials from the Ceilings of the shop per the PBS report. Remove all over head lights, conduits, water line & other items on the ceiling to be placed back after the ACM removal and abatement. Remove all overhead door tracks and door operators that conflict with the ceiling removal to be place back after the ACM removal and abatement. Install New Ceiling that is to be OSB 5/8” plywood, painted white to match existing interior walls.