Specifications include, but are not limited to: provide all necessary expertise, labor, equipment, materials, incidentals, and permits required to construct a new hatchery building which includes but is not limited to: clearing and grubbing, construction of building pad, construction foundation and wall system, framing for the 2nd floor, providing electrical, plumbing, and HVAC services, connect new supply piping to existing 24” high-density polyethylene (“HDPE”) supply line, installing new discharge piping and storm piping including new manholes, and constructing and/or installing concrete vaults and catch basins. Contractor shall also install owner-supplied drum filters and ultra-violet water treatment systems and water refrigeration equipment as indicated on plans. Moreover, Contractor shall perform site restoration including pavement.