Specifications include, but are not limited to: A. Furnish and install pedestrian barricade to exclude entrance to footbridge over creek. B. Provide traffic control to allow for equipment backing in to the site from East Main Street C. Protect sidewalk from equipment loads with metal plate D. Provide ADA-accessible ramps and signage on either side of sidewalk protection plate E. Provide observer and signage regarding 10-foot restricted zone around energized power lines F. Furnish and install sandbag worksite isolation dam, approximately 9 feet (L) by 1 feet (H) at downstream end of sediment trap. G. Remove aquatic vegetation and haul to City’s disposal site at B Street Yard, O.5 MILES. No separate payment will be made for removal and disposal of vegetation. H. Remove up to 116 cubic yards of accumulated sediment (approximately 1.8 feet in depth, evenly distributed across sediment trap surface), or as approved by Project Manager to meet sediment trap design criteria I. Dispose of sediment at Agency-provided disposal area, Croman Mill site, 2.2 MILES. J. Reseed any disturbed ground above the active stream channel resulting from construction activities (excluding equipment access route).