Specifications include, but are not limited to: 1 LS Erosion Control; 40,500 SY Compost Erosion Blanket with Hydroseeding; 6,200 FT Sediment Fence; 130 TN Load, Haul, Dispose Contaminated Soil; 1,300 FT Remove, Prepare and Dispose Steam Pipe; 1 LS Construction Survey Work; 1 LS Removal of Structures and Obstructions; 670 FT Removal of EWEB Fiber and Power Duct Bank; 45 EA Tree Removal; 24,000 CY General Excavation; 4,000 CY Crushed Concrete; 1,400 CY Loose Riprap. Class 100; 240 FT 8 Inch Ductile Iron Pipe, 5 ft Depth; 35 EA Adjusting Inlets; 1 LS Electrical Distribution UG Feeder Reroute; 4,000 SY Aggregate Working Platform, 18 Inches Thick; 35,300 SF Weed Control; 1.3 AC Temporary Seeding; 20,391 EA Tubeling Plant; 2,900 FT Removing and Rebuilding Fence; 1 LS Irrigation System; 296 FT 8 Inch Ductile Iron Pipe with Restrained Joints and Class B Backfill