Specifications include, but are not limited to: Remodeling four existing restrooms on the 2nd and 3rd floor of the Atrium Building, 99 W. 10th ave; Eugene, OR. Work includes replacing partitions, demo of tile walls, new countertops, replacing sinks/faucets, installing wainscot, installing new floor covering, and painting. 2.1. Partitions: replace all partitions with new partitions in similar configuration. Material: HARDRIAN Partitions, smooth stainless steel (finish: type 3041 #4 brushed, overhead braced floor anchoring, standard stainless-steel hardware from Robert Brooke and Associates. 2.2. Flooring: replace existing flooring. Material: Armstrong Corlon (88717 – Otter Gray) 2.3. Demo tile walls: remove tile from walls. Patch and repair wall where needed. Install wainscot 4’ high. Material: Armstrong corlon (88717 – Otter Gray) 2.4. Countertops: install new solid surface counter tops. Material: 2cm Pebble Quartz Slab (14500) with 7” miter drop edge, ¾” flat polish on exposed edges with 6” high, flat polished back splash. 2.5. Sinks: replace all sinks with new sinks and faucets. Material: undermount oval lavatory sink with Moen 8215 faucets and grid strainers. 2.6. Paint: paint all drywall surface. Material: walls and ceiling (CA181 Moonstone); behind mirrors (CA195 Harbor Grey)