Specifications include, but are not limited to: A Terminal Area Concept Plan is needed to review current facilities and recommend improvements. The plan will include the terminal building, aircraft parking areas, and adjacent facilities effected by the proposed improvements. ; 1. Develop a cost-effective conceptual terminal building facility expansion plan complying to FAA Advisory Circular 150/5360-13A: a. Considering the rapid growth of the Airport and community; b. Identify problems at the existing terminal facility by conducting a Situation Assessment, then determine which problems will be addressed in this study. c. Identify the unique operational and environmental conditions of Airport and incorporate them into the conceptual expansion plan ; Creation of a Development Plan to an approximately 10% design level. Review existing conditions and provide recommendations for expansion of the existing terminal building structure, and other areas as potentially affected by the expansion. Areas of concern include: o Secure area hold room o Maximize utilization of existing upper level o Increase space for rental car agencies, bag recovery, bag room, etc. o Implementation of upper level boarding, covered walkways and sky bridges.