Specifications include, but are not limited to: · Remodel work of: 9200 GSF within existing building to relocate the administration facility, (reception, staff offices, and staff work area) with new main entry to the school with ADA ramp access, to a secure vestibule, the addition of three science classrooms, and science prep room, window upgrades and upgrades to the Library, and modification to some of the existing classrooms within the existing building footprint. Replacement of single pan windows in the Library, and East Classroom Wing. · Other improvements include full roofing replacement, general plumbing & HVAC, access control upgrades, new main entry secure vestibule and line-of sight security upgrades, security/alarm systems, intercom system upgrades, expanded wireless access pints. · Seismic upgrades are anticipated to existing building, Seismic upgrades primarily to; the two-story Classroom Wing, the Library, the Cafeteria, the existing locker rooms, and existing roof areas of the Auditorium, Cafeteria and Kitchen, and the Locker Rooms and Main Gymnasium.