Specifications include, but are not limited to:. The work to be done consists of furnishing all labor, equipment, tools, materials and supervision to construct a new approximately 570,000 gallon prestressed concrete reservoir on the west side of the Crystal Springs Water District near Odell; installation of a pre- manufactured building and in ground vaults; construction of an access road to the reservoir site from Sylvester Dr. and an access road from Lippman Rd.; construction of approximately 5,000 lineal feet of 12" diameter ductile iron waterline from Lippman Road to the reservoir site, including (1) creek and (1) canal crossing; construction of approximately 4,500 lineal feet of 10" diameter ductile iron waterline from Sylvester Drive to the reservoir site, including (1) creek and (1) canal crossing; and connecting power to the reservoir site.