Specifications include, but are not limited to: • Project construction meetings for coordination with City staff. • Plan submittal and implementation of Site Specific Health and Safety Plan. • Plan submittal and implementation of Traffic Control and Parking Restrictions for work zone. • Submittals for materials to be used in the construction of improvements. • Drafting and distribution of project notification for work area. • Sawcutting, removal and disposal of road surfaces and other existing surface features. • Maintenance of road surfaces (temporary asphalt, plates, etc.) during construction. • Construction and maintenance of temporary Erosion Control in work area. • Excavation, transportation and disposal of materials to appropriate facility. • Construction of sewer pipelines (private and public laterals). • Temporary protection of existing utilities. • Construction of pipeline bedding and backfill in trenches and manhole excavations. • Connections to existing public sewer facilities (pipelines and manholes). • Cutting and capping of existing private sewer laterals connected to mains or other private sewer laterals in a non-conforming fashion. • Inspection services including: closed circuit television inspections, air testing, mandrel testing and marker balls (post resurfacing). • Final surface restoration of road surfaces, sidewalks, curbs, driveways, etc.. • Additional work tasks as specified by the City related to the forced connection sewer program, including providing requested subcontracted professional and technical services to support completion of the work.