This is a request for bids under the On-Call Region 2 Paving Price Agreement series. Only price agreement holders may submit bids. Project description (include milepoint locations): I5 SB “B” Lane MP248.10-247.90 – Longitudinal joint to longitudinal joint (typically 13’ wide, the first 100’ will need to be 14’ wide), ~1000’ length total. Skip lines and recessed markers will be removed and replaced. Fog line to be retained. “A” lane rumble strips to be removed and replaced (match existing) for safety. Work starts just south of Delaney SB on-ramp. I5 SB “B” Lane MP247.90-246.00 – Lane “A”/”B” longitudinal joint to just inside of fog line (fog line to be retained), 13’ wide. Skip lines and recessed markers will be removed and replaced. “A” lane rumble strips to be removed and replaced (match existing) for safety. Work ends near the 246 mile marker. I5 NB “C” Lane MP245.90-246.55 – Lane “B”/”C” longitudinal joint to just inside of fog line (fog line to be retained), 3690’ total length. Skip lines and recessed markers will be removed and replaced. “A” lane rumble strips do not need to be removed due to three lane highway. Work starts at the beginning on the "C" lane as I5 starts to climb the hill. The limits of all locations are painted in the field.