Chandler (Coos River) Bridge Project on the Coos River Highway (Rt. No. OR241) near Coos Bay. FAP No. S241(008). ($ 5,000,000 - $ 10,000,000). Req. approx. 1,420 ft2 temp. signs; 9 ea PCMS; 3,150 hr flag.; 2 ea flag. sta. light.; 2 ea AFAD; 1,450 ft temp. barr.; 4 ea temp. imp. atten.; 1 ea port. traf. sig.; 2 ea temp. flash. beac.; 32 ea inlet prot.; 375 ft sed. barr.; 34 ton contam. soil disp.; const. surv. wrk.; 500 ft asph. pvmt. sawcut.; 100 yd3 exc.; 33 yd2 geot.; 162 ft drain. curb; 322 lb reinf.; 1 yd3 dk. conc.; 0.6 yd3 gen. str. conc.; 2,487 lb str. stl. main.; 40 ft cond. sys.; surf. prep.; coat. app.; coat mtl.; 456 ft pack rust rem.; 2 ea soldier pile wall; 2 ea acc. gate; 240 ea fast. install.; 4 ea barr. gate; 2 ea fall arrest sys.; 2 ea machine house door; 20 ea rvt. & bolt repl.; 2 ea traf. gate; 200 ton aggr. base; 65 ton ACP; 525 ft gd. rl.; 40 fbm wood sign post; 335 lb stl. in br. str. mts.; 75 ft2 signs; lumin., lamps, & ball.; 0.2 acre seeding. Completion Time: September 18, 2026. Classes of Work: Either: A) Bridges and Structures, or B) Painting.