Specifications include, but are not limited to: • Demolition and tree protection • Site grading • Electrical service including new meter, conduit runs, wiring, and electrical panel, security lighting, outlets and associated electrical appurtenences within the chase of the prefabricated restroom building. • Paving materials - Standard commercial driveway at the site entry - Permeable asphalt pavement (parking lot/hammerhead turnarounds) - Permeable concrete pavement (plaza) - Crushed rock paved trails - Curbing • Stormwater drainage facilities with associated piping system (see Sheet C1.0) • Planting (see Sheet L3.0) • Site furniture installation • Fencing (split rail, post and cable) • Stone masonry seatwall and boulder walls • Signage and contractor salvaged end-of-roadway markers (see Sheet L1.1) • Automated entry gate installation with Contractor Furnished Contractor Installed (CFCI) motors, loops, and pads • Owner Furnished Contractor Installed (OFCI) work (Contractor to coordinate with the Metro project manager for delivery times and provision of onsite storage prior to installation): - Site preparation, backfill and electrical work associated with the prefabricated vault toilet building to be delivered, placed and assembled on site by the manufacturer. - entry gate arms and posts with associated foundation connection hardware. All assembly, concrete foundations, pads, motors, sensor loops, keypad and emergency access “Knox Box” will be performed by the successful bidder. - trash and recycling receptacles - bike racks - unassembled picnic table kits to be assembled by the successful bidder - metal folding bollards and padlocks - preassembled wood kiosk - preassembled benches - plant materials (trees, shrubs, site and stormwater seed mixes) - custom signage for the entry monument