Specifications include, but are not limited to: Replace (4) Boilers. HVAC Controls Upgrades (Computer operating software, VFD's, Bellimo actuators, valves for CPE and District Office). Intercom/Clock/Alarm System Improvements Replace current clock system. Upgrade problematic fire system panel. Security Cameras Add cameras in Entrances, Hallways, Gym, Cafeteria & Playground (Estimate based on 1:25 camera/student). ; Storm Drain Improvements Upgrade or replace existing storm drain system. Site Configuration/Drop-off/Parking Reconfigure and/or expand roadways and drop-off lanes. Pave Gravel Parking Lots Upgrade gravel roadways and parking lots to asphalt. Wrought Iron Fencing Upgrade site fencing. Building Remodeling Remodeling of Select Rooms Replace Windows & Remodel Cafeteria Door Hardware Replacements Replace (30) Classroom locksets with keyed double cylinder functions. New Construction New 12,000 SF Gym, new 2,500 SF Multipurpose Room and new 8,100 SF Breezeway. ; Plumbing System Improvements Replace Domestic Water Distribution. Replace Plumbing Fixtures in Classrooms and Kitchen. New Fuel System connections for Gas Fired Equipment. Sanitary System Improvements Replace Sanitary Waste System. HVAC & Controls New forced air rooftop gas pack system with JCI controls. Existing boiler/steam system to remain as a backup. Electrical System Improvements Replace all original electrical service equipment. Intercom/Clock/Alarm System Improvements Replace current Intercom, clock and alarm systems.