Loading...
Skip to main content
< Back to results

Employment Building Cooling Plant Replacement


Location
Oregon
Publication Date
08/06/2019 08:06 AM EDT
Closing Date
08/29/2019 05:00 PM EDT
Issuing Organization
State of Oregon Department of Administrative Services
Solicitation Number
Description

Specifications include, but are not limited to: 1. Replace two, 200-ton screw chillers, with mag lev type centrifugal chillers. 2. Replace two condenser water pumps and provide VFDs. 3. Replace two chilled water pumps and provide VFDs. 4. Connect new chillers in parallel instead of in series. 5. Convert existing constant volume pumping system to variable volume to enable the chillers to function in a parallel configuration. 6. Provide chilled water storage to provide recommended total system water volume. 7. Provide code-compliant refrigerant monitoring and ventilation system. The existing exhaust fan will be equipped with a VFD for airflow control. 8. Replace the existing cooling tower with a new cooling tower. 9. Provide a structural steel base for the new cooling tower on the existing steel base rails.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids