Specifications include, but are not limited to: Removal of Pipes; 18 EA Removal of Inlets; 4 EA Removal of Manholes; 5,000 FT Pavement Saw Cutting; 2,900 CY General Excavation; 2,000 SF Subgrade Stabilization; 104 FT Perforated PVC 6 Inch Drain Pipe; 497 FT 10 Inch C-900 Pipe; 507 FT 12 Inch C-900 Pipe; 8 FT 3 Inch PVC Pipe; 1 EA Pipe Tees, 10 Inch; 1 EA Pipe Tees, 12 Inch; 2 EA Pipe Tees, 15 Inch; 1 EA Concrete Manholes, Storm; 4 EA Concrete Manholes, Shallow; 3 EA Concrete Inlets, Type 4 A; 8 EA Catch Basins, with Steel Bike Proof Grates; 6 EA Planter Overflow Inlet; 10 EA Modified Curb Inlet; 13 EA Minor Adjustment of Manholes; 12 EA Pothole; 14 EA Adjusting Boxes; 3 EA Connection to Existing Structures; 1 EA Connection to Existing Pipe; 747 SF Cold Plane Pavement Removal, Taper 0 – 2 Inches Deep;