Specifications include, but are not limited to: • Provide Work Zone Traffic Control • Construct Temporary Water Management Facility as needed • Clean and CCTV multiple culverts • Install multiple CIPP liners • Perform additional and incidental work as called for by the Contract plans and specifications and as directed The locations are as follows, I-84 • Culvert # 1 Mile-Post 241.77 – CMP, 86 feet in length, 15“ diameter • Culvert # 2 Mile-Post 242.37 – CMP, 66 feet in length, 15“ diameter • Culvert # 3 Mile-Post 234.11 – CMP, 169 feet in length, 18” diameter • Culvert # 4 Mile-Post 243.46 – CMP, 179 feet in length, 27” x 42” arch pipe • Culvert # 5 Mile-Post 243.68 – CMP, 195 feet in length, 24” diameter • Culvert #6 Mile-Post 243.75 – CMP, 200 feet in length, 30” diameter • Culvert #7 Mile-Post 243.95 – CMP, 137 feet in length, 18” diameter • Culvert # 8 Mile-Post 244.32 – Conc., 54 feet in length, 15” diameter • Culvert # 9 Mile-Post 244.50 – CMP, 84 feet in length, 15” diameter • Culvert # 10 Mile-Post 244.64 - CMP, 82 feet in length, 15” diameter