Specifications include, but are not limited to: 1. Install two (2) new 400 HP SOU furnished low pressure steam boilers. 2. Install an SOU furnished deaeration tank and pump system. 3. Replace two (2) existing 800 ton and 500 ton water chillers with two (2) new 800 ton centrifugal chillers. 4. Replace the existing roof mounted three (3) cell cooling tower with a larger capacity two (2) cell cooling tower. 5. Demolish concrete floor slabs and install new reinforced concrete equipment pads. 6. Furnish and install new steel tank frames, steel platforms, and miscellaneous steel stairs and railings. 7. Furnish and install significant new piping, valves, pumps, pipe insulation and related equipment. 8. Provide electrical connections for all new equipment.