Specifications include, but are not limited to: IDENTIFICATION OF PROJECT: Major items of work for each Work Schedule consist of the following: Schedule A: Construction of approximately 4,000 SF of concrete sidewalk, new curb and gutter, a new pedestrian crossing with Rectangular Rapid Flashing Beacon and curb ramps, associated signing and striping, curb ramps, concrete safety islands, bike lane widening, a new streetlight, and other items as called for on the Plans. Schedule B: Construction of approximately 13,300 SY of 2" cold plane asphalt removal and inlay, 15,300 SY of seal coat (Texture Seal), 1,300 SY of full depth asphalt repair, and 3,000 SF of sidewalk repair including reconstructed curb ramps, and associated pavement striping and markings replacement as shown in the Plans. Schedule C: Reconstruction of six (6) concrete catch basin inlets and associated curb and storm pipes as shown in the Plans.