The Barney Reservoir Joint Ownership Commission (BRJOC) seeks sealed bids from qualified firms able to provide all equipment, materials, and labor required to remove approximately 1,550 linear feet of chain link fence and fence posts em-bedded in the top of a concrete dam spillway structure, and replace approximately 1,550 linear feet (1,300 linear feet of 5-ft high fence and 250 linear feet of 7-ft high fence) of new galvanized chain link fence (6 gauge) and posts at the BarneyReservoir Dam Spillway located off N Fork Trask Road, Yamhill, Oregon. Work toinclude the removal of existing fence posts where possible, removal of loose debris and water from existing fence post sockets, and backfill with epoxy resin mortar topped with an elastomeric polyurethane coating. Where fence post removal is infeasible, existing posts to be cut below top of wall, and the location back filled with epoxy resin mortar and topped with an elastomeric polyurethane coating.