Specifications include, but are not limited to: This project involves the design of interim and long‐term widening of Center Street from east of Lancaster Drive through 45th Place, and the construction of the first phase of improvements along the north side of Center Street in this section. The project will construct widening of the street to an interim three‐lane section, along with the sidewalk and bicycle lane on the north side of Center Street, as called for in the Salem Transportation System Plan. It will also include a center lane pedestrian refuge island at 45th Place where a key school crosswalk is currently located. Based on current volumes and future projections, Center Street will likely warrant a 5‐lane section within 15 to 20 years, hence the need to develop the three‐lane section in an interim manner that will allow conversion to a five‐lane section in the future, per the Salem Transportation System Plan (TSP) major arterial cross‐section. The design for the ultimate section (south side) will only be to the approximate 60% level given the likelihood of time passing before additional funding is available. All pedestrian features will be Americans with Disabilities Act (ADA) compliant.