Specifications include, but are not limited to: •Construct, maintain, and remove temporary work zone traffic control measures.•Construct, maintain, and remove erosion control measures.•Perform all removal of structures and obstructions, clearing and grubbing, and earthwork operations.•Construct drainage system including stubs to lots, water quality facilities, sewer pipes, manholes, inletsand connection to existing system.•Construct sanitary sewer system including stubs to lots, sewer pipes, manholes, and connections to existing public system.•Install water main, vaults, hydrants and corrosion control per EWEB standards.•Construct single and joint conduit trenches for Franchise Utilities.•Install conduit and vault infrastructureper EWEB standards.•Install conduit and vault infrastructure for communications. •Construct retaining walls.•Construct roadway improvements including aggregate working platforms,asphalt concrete pavement wearing surfaces, plain concrete pavement, concrete curb and sidewalks.•Place pavement markings and striping.•Install signing.•Install illumination.•Roadside development including seeding, planting, fencing and irrigation.•Removal and management of incidental contaminated soil, if encountered.•Removal and disposal of asbestos containing steam pipes and vault(s).•Develop and implement an appropriate Health and Safety Program.•Perform additional and Incidental Workas called for by the Specifications and Plans.