Specifications include, but are not limited to: PERMITS AND FEDERAL REQUIREMENTS Compliance with all required permits and federal requirements SITE PREP Grading Erosion Control (sedimentation control and erosion prevention) Expanded parking near main building; the parking area near the new site requires new gravel Infrastructure above and below grade to connect the new buildings and electrical De-watering (if needed, change order) Structural fill (see geotech and engineer design per requirements), including importing and exporting construction spoils Tree removal Signage SHELTER WITH SNOW VESTIBULE(s) (Agency purchased 12'x14’ prefabricated equipment shelter and a mated new 12'x10' prefabricated generator shelter, approx. 50,000 pounds) Transportation to site from location on Hwy 58 Foundation Field assembly 2 snow vestibules GENERATOR Transportation to site from Salem Installation TOWER (Agency provided 120 ft lattice tower on concrete slab) Transportation to site Lower sections – from Hwy 58 site Upper sections – from Agency’s Salem office Foundation Installation of tower Contractor shall provide stainless steel or galvanized exterior hardware Installation of RF equipment on tower ICE BRIDGE (purchased by Contractor) Installation Posts PROPANE TANK (1000 gallon tank provided by Agency) Transportation from Agency’s Salem office Concrete pad Installation 60 ft buried gas line to shelter Protective bollards Ice shield and posts POWER Electrical installation under or immediately adjacent to the existing access road from the existing pole mounted transformer adjacent to the existing AT&T access road to the main service disconnect to be located on the shelter Grounding INSPECTIONS Coordinate with Agency’s Special Inspector for all concrete, soils density and fill, proctor, grounding, erosion control, and steel inspections TESTING AND COMMISSIONING Generator commissioning New Heating, Ventilation, and Air Conditioning units require commissioning by a licensed HVAC professional to be hired and provided by the Contractor CLOSE OUT Road repair Site “free of vegetation” Removal and disposal of tree stumps, debris, slash and excess excavation materials