Specifications include, but are not limited to: 1.1. Contractor must schedule services with the DEQ Contract Administrator thirty (30) calendar days in advance. 1.2. Unless otherwise provided in this section all services shall be performed during the hours of 8:00 AM – 5:30 PM on Mondays only, excluding holidays observed by the State of Oregon. Contractor must provide backflow, dry fire testing and hydrant testing in accordance with the frequency and service dates in this Section 2. 2.1. Backflow and Dry Fire Annual Testing shall be completed as follows: 2.1.1. 2019 backflow and dry fire system inspections no later than November 29, 2019. 2.1.2. 2020 – 2024 backflow and dry fire system inspections no later than November 30th 3.1. Outlets 3.1.1. #60872, 6” AMES 3000SS, S/N 3FL1817, Vault West of Drive 3.1.2. .75 WATTS 007, S/N 82124, Vault West of Drive 3.1.3. #59915, 1.5” WATTS 007M2QT, S/N 19939, Door to North Side Restroom 3.1.4. 1.5 WATTS 007M2QT, S/N 19974, by Meter