Work to be performed includes, but is not limited to: the construction of approximately 500 linear feet of new roadway intersecting the east side of the existing Grove Road. This work will involve excavation, backfill and grading, subgrade preparation, and sitework. Additionally, utilities such as manholes, gravel surfaces, and connections to existing water, sewer, and storm systems will be installed, along with any other necessary components to complete the road improvements. As part of the project, approximately 1,080 feet of new 12-inch ductile iron waterline will be installed, connecting to the existing 8-inch waterline at Fern Valley Rd. Additionally, 2,450 feet of new 12-inch PVC sewer line will be constructed, tying into the existing 15-inch sewer line at Pear Tree Ln and Fern Valley Rd. To manage runoff from the increased impervious surface, new storm drains and a stormwater planter will be installed along the newly developed road, outfalling to the existing stormwater collection along Grove Road.