This project involves the construction of street improvements at the intersections of Rosa Parks Way at Greeley Ave., N and SW St. Clair Ave. at W Burnside St. 1 MOBILIZATION 0210 LS 1.00 2 TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC 0221 LS 1.00 3 SEQUENTIAL ARROW SIGNS 0222 EACH 2.00 4 TEMPORARY SIGNS 0222 SQFT 410.50 5 FLAGGERS 0223 HOUR 760.00 6 TRAFFIC CONTROL SUPERVISOR 0223 LS 1.00 7 TEMPORARY PLASTIC DRUMS 0224 EACH 14.00 8 TEMPORARY BARRICADES, TYPE II 0224 EACH 18.00 9 TEMPORARY BARRICADES, TYPE III 0224 EACH 12.00 10 TEMPORARY REMOVABLE TAPE 0225 FOOT 850.00 11 STRIPE REMOVAL 0225 FOOT 1,070.00 12 LEGEND REMOVAL 0225 SQFT 60.00 13 BAR REMOVAL 0225 SQFT 544.00 14 CHANNELIZING DEVICES 0228 FOOT 640.00 15 TEMPORARY CURB RAMP, CONSTRUCTED 0228 EACH 14.00 16 TEMPORARY WALKS 0228 SQFT 2,700.00 17 EROSION CONTROL 0280 LS 1.00 18 INLET PROTECTION, TYPE 3 0280 EACH 12.00 19 POLLUTION CONTROL PLAN 0290 LS 1.00 20 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 0310 LS 1.00