Build cabinets with level 3 bullet resistance rating and install according to county standards. Please refer to drawing attachment below. A field verification of measurements is required to allow for fine tuning of written dimension. The contractor shall be responsible for supplying and installing fully finished cabinets and countertops. This includes all required materials and labor as per drawings and these specifications. Supply shop drawings or technical specifications for approval, if required, before starting any installation or fabrication. No changes will be made unless authorized and approved in advance by Clackamas County. Work will be completed in accordance with a schedule approved in advance by the County. Any materials paid for by the County and not incorporated into the project shall become the property of the County and remain at the project site.