The purpose of this ITB is to establish a contract for NB Boone Bridge (I-5 Over Willamette River at MP 283.11) Joint Rehabilitation Project (the “Project”) for the benefit of the Oregon Department of Transportation (“ODOT”) (the “Contract”). The work to be performed under this Contract includes all labor, materials, transportation, equipment, permits, and services for and incidental to the completion of all construction work in connection with the Project in strict accordance with the Contract Documents. The work, includes, but is not limited to: Constructing temporary and permanent bridge joints. Constructing premixed polymer concrete overlay. Installing pavement markings and performing additional and Incidental Work as called for by the Specifications and Plans.