The AC surface was damaged from a recent truck rollover on OR58 at MP59.67-59.75. The repair work requires 3" inlay paving in the WB "A" lane and the EB lane. Width limits to be 2' outside of the fog line in the WB direction to the south (outside) edge of the white passing lane skip line in the WB direction (Approx. 26'). Project length is 225' and is painted in the field. 1 Mobilization 1 LS 0.0 2 Temporary Work Zone Traffic Control, Complete 1 LS 0.0 3 Pollution Control Plan 1 LS 0.0 4 Cold Plane Pavement Removal, 3" Deep 650 SQ YD 0.0 5 Level 3, 1/2" Dense ACP Mixture (PG64-28) 110 TON 0.0 6 Hi-Build Paint, Extruded or Sprayed, Grooved 732 FOOT 0.0 7 Gap Pattern Rumble Strips 0.05 MILE 0.0 8 Mono-Directional White Type IAR Markers, Recessed 6 EACH 0.0 9 Bi-Directional Yellow Type IAR Markers, Recessed 6 EACH 0.0