Schedule A - South Welches Pump Station A-1 Mobilization, Bonds, Insurance and Demobilization 1 LS A-2 Erosion and Sediment Control 1 LS A-3 Bypassing 1 LS A-4 Existing Pump Station Demolition 1 LS A-5 Pump Station Upgrades, Complete 1 LS A-6 Asbestos Survey 1 LS A-7 Asbestos Removal and Disposal Allowance 1 F-A Schedule B - Golf Club Terrace Pump Station B-1 Mobilization, Bonds, Insurance and Demobilization 1 LS B-2 Erosion and Sediment Control 1 LS B-3 Bypassing 1 LS B-4 Existing Pump Station Demolition 1 LS B-5 Pump Station Upgrades, Complete 1 LS B-6 Asbestos Survey 1 LS B-7 Asbestos Removal and Disposal Allowance 1 F-A Schedule C - 82nd Drive Pump Station C-1 Mobilization, Bonds, Insurance and Demobilization 1 LS C-2 Erosion and Sediment Control 1 LS C-3 Bypassing 1 LS C-4 Existing Pump Station Demolition 1 LS C-5 Pump Station Upgrades, Complete 1 LS C-6 Asbestos Survey 1 LS C-7 Asbestos Removal and Disposal Allowance 1 F-A