Specifications include, but are not limited to: install a permanent covered dome system for the 50M outdoor pool at the MHCC Aquatics Center, with the following goals: Find the most efficient way to operate the aquatic center while making use of the outdoor pool during the winter months. 1) Allow for visibility of spectators in the bleachers through either a retractable or a clear structure. 2) Maintain clearances for operations and egress paths, meeting operability and local code standards 3) Use as much of the existing infrastructure as possible 4) Complete the design and installation no later than October 31st 2022 The college is seeking: 1) Proposers to supply product ideas and information 2) Architectural and Engineering services to provide an architectural and engineering package for the prescribed project 3) These 2 services to work directly with MHCC on the completion of the project 4) Potential options for scoreboard replacement