Specifications include, but are not limited to: 3.3.1Contractor will patrol the exterior of the site, check fence perimeters, inspect door and window entrances, and perform a general patrol of the entire site throughout the scopehours.3.3.2Selected Contractor shall provide proactive vehicle and foot patrols in a variety of weather conditions at site location.3.3.3Patrol Schedule;3.3.3.1Contractor shall provide continuous twenty-four (24) hours of onsite security coverage (“Guards”) at the Property, including weekends and holidays until thestate of emergency caused by the SARS-COVID-19 pandemic has ended.3.3.3.2After the State of Oregon has declared the emergency over, Prosper Portland will notify the awarded contractor to change the patrol schedule. Contractor will not change scheduled until Prosper Portland has provided notification inwriting.3.3.3.3Adjusted patrol schedule will be 5:00 PM – 8:00 AM Monday-Thursday and from5:00 PM Friday evening until 8:00 AM Monday morning.