Specifications include, but are not limited to: OR8: Canyon Rd Pedestrian Enhancements Project on the Tualatin Valley Highway (Rt. No. OR8) near Beaverton. FAP No. S029(027). ($ 1,000,000 - $ 2,000,000). Req. approx. 1,700 ft2 temp. signs; 4 ea seq. arr. signs; 2 ea PCMS; 260 hr flag.; 4 ea flag. sta. light.; 70 ea TCS; 1 ea TMA; 120 ft PCD; 3 ea temp. curb ramp; 60 ft2 temp. walks; 16 ea inlet prot.; 100 ft sed. barr.; 35 ton contam. soil disp.; 55 gal contam. grndwtr. rem.; const. surv. wrk.; 2,200 ft asph. pvmt. sawcut.; 520 yd3 exc.; 130 yd2 geot.; 38 ft vid. insp.; 38 ft DI pipe; 4 ea conc. inlets; 1,100 ft drain. curb; 17 yd2 tr. resurf.; 580 yd2 CPPR; 130 ton aggr. base; 87 ton ACP (5 ton PG70- 22ER); 370 ft conc. curb; 1,400 ft2 conc. islands; 1,700 ft2 conc. walks; 10 ea curb ramps; 130 ft2 trunc. domes; 800 ft thermo. striping; 120 ft curb mrkg.; 5 ea x-walk clos. sup.; 0.9 yd3 conc. in sign sup.; 1,310 lb st. in sign sup.; 160 ft2 signs; pole found.; lumin., lamps, & ball.; switch., cond., & wir.; light. poles & arms; 1 ea traff. sig. mod.; 1 ea flash. beac. install.; 360 yd3 topsoil; 18 ea trees; 1,200 ea shrubs; 240 ea bulbs; 60 yd3 mulch; 800 ft root barr.; irr. sys. Completion Time: May 15, 2026. Classes of Work: either A) Electrical, or B) the combination of any two classes in the following list: Earthwork and Drainage, Landscaping, or Miscellaneous Highway Appurtenances.