• Assistance to project team design team during design development construction document phase for design review, system/materials selection, and sequence of operations review and recommendations. • Consult with the District and the Design Team to determine design criteria. Such consultation will include evaluation of alternatives from functional, performance, time, and cost perspectives. • Assist in life cycle value analysis from drawings, specifications, other design criteria, and alternative designs as may be requested by the District. • Participation in the Value Engineering and Target Value Design processes to ensure that optimized form and function are implemented for the budget available. • Provide commissioning specifications and input on language for Division One of the specifications. • Provide commissioning plan for the project and coordinate with the District and design team for completion strategy of plan. • Implement commissioning plan, pre-functional testing, functional testing, corrections, and trending as required by District. • Coordination and assistance to the District and the design team with documentation for qualification of incentives available through both the Energy Trust of Oregon and SB1149. • Attend project team meetings and coordination sessions. • Assist the District is applying for and providing documentation for qualification of incentives available through the Energy Trust of Oregon. • During design review they should help the district identify areas of savings both in up-front costs and in energy savings.