Myrtle Point/Gold Beach/Brookings/Roseburg Curb Ramps Project on Various Highways) in Myrtle Point, Gold Beach, Brookings, and Roseburg. FAP No. SR05(002). ($ 2,000,000 - $ 5,000,000). Req. approx. 6,075 ft2 temp sign; 14 ea seq arr; 10 ea PCMS; 100 hr flag; 4 ea flag sta light; 200 ea TCS; 2,100 ft PCD; 90 ea temp curb ramp; 540 ft2 temp walk; 5 ea conc washout; 41 ea inlet protect; 200 ft sed barr, 87 ton contam soil disp; const surv work; 2,545 yd2 rem surf for curb ramp const; 2,810 ft asph sawcut; 850 ft conc sawcut; 37 ft pipe; 17 ea adjust struct; 450 yd2 CPPR; 1,660 ton aggr base; 400 ton ACP; 600 ft2 asph slope pave; 6,300 ft2 pmvt repair; 3,085 ft conc curb; 17,350 ft2 conc struct; 85 ea curb ramp; 1,100 ft2 trunc dome; 90 ft pvmt marking durable; 960 ft2 transv pvmt marking; 557 lb sign supp; 9 ft2 sign; traff signal mod; 45 yd3 topsoil; 10 ton rock mulch; 6 ea ped fence. Completion Time: July 16, 2026. Class of Work: Miscellaneous Highway Appurtenances