The scope of work consists of furnishing all materials, labor, equipment, and supervision necessary to abandon and removal of the foundation, associated site piping appurtenances, and replacement of the existing pump station. Water Systems upgrades include, but are not limited to, the following: abandonment of a section of existing water distribution system; construction of approximately 200 feet of new water distribution pipelines with all relevant fitting, valves; installation of two isolation valves; a new distribution pump station which includes new electrical, new pumping equipment, standby gas generator and all other relevant equipment; construction site improvements that include, masonry pavers, and landscaping of site; on-site stormwater management and facility startup and testing.