The project includes: · Rehabilitation of approximately 1,410 linear feet of 8" - 12" storm and sanitary sewer through cured-in-place pipe (CIPP) lining. · Replacement of approximately 170 linear feet of 8" sanitary sewer through pipe bursting. · Installation of approximately 1,620 linear feet of new 8" - 12" storm and sanitary sewer. · Installation of approximately 160 linear feet of 8" high density polyethylene pipe (HDPE) sanitary sewer through horizontal directional drilling (HDD). · Inspection and rehabilitation of approximately 95 sanitary sewer laterals from the mainline to within 5 feet of the building. · Installation of approximately 15 new concrete sanitary and storm sewer manholes. · Replacement of the existing roadway surfacing of Monroe Street from 5th Street to 6th Street and Taylor Street (from 7th Street to 9th Street) through 2" asphalt concrete pavement (ACP) Grind and Inlay.