1. JOSEPHINE COUNTY: I-5: Monument Dr. – N. Grants Pass Section of the Pacific Highway (Rt. No. I-5) in Grants Pass. FAP No. S001(549). ($ 20,000,000 - $ 30,000,000). Req. approx. 1,570 ft2 temp sign; 6 ea PCMS; 2 ea rdr spd triler; 770 hr flag; 90 ea TCS; 120 hr pilot car; 30,050 ea temp pmvt marker; 380,375 ft temp stripe; 90 day smart work zone sys; 15,730 yd2 comp ero blanket; 53 ea check dam; 91 ea inlet protect; 3,906 ft sed barr; const surv work; rem barr; 20,500 ft asph pmvt sawcut; 11,650 yd3 gen exc; 1,010 yd3 stone emb; 350 yd2 subg stabil; 12 mi prep shoulder; 55 ft pipe; 2,065 ft drain curb; br rem work; hot app joint seal replace, 63 ft conc rail; 1,438 yd2 br appr slab; 34 yd2 cl 2 prep; 7,013 yd2 MPCO; 25 ft3 elsto conc nose; 1,263 ft exp joint; 59 yd3 struct exc; 4 yd3 gran struct backf; 360,800 yd2 CPPR; 8,300 ton aggr base; 45 ton fog coat; 155 ton tack coat; 76,000 ton ACP (4,350 ton PG70-22ER); 2 ea core corr; 33 ea asph appr; 108 ea 8 ft post; 35,273 ft gr rl; 256 ft rem reinstall cable barr; 425 ft conc barr; 8 ea br id marker; 2,870 ea marker recessed; 29 mi rumb strip; 229,570 ft pmvt marking durable; 788 fbm wood sign post; 220 lb sign mount; 5,561 lb sign supp; 436 ft2 sign; refurb reinstall illum sys; auto traff recorder; 3 acre seed; 3 acre mulch; 2,525 ft fence. Completion Time: October 2, 2026. Class of Work: Asphalt Concrete Paving and Oiling. THIS PROJECT CONTAINS ASPHALT AND FUEL ESCALATION CLAUSES. THIS PROJECT CONTAINS A 11% DBE GOAL. PROJECT MANAGER: JOSH LONIE, EMAIL: JOSH.E.LONIE@ODOT.OREGON.GOV