Specifications include, but are not limited to: 1. The new systems to be commissioned are (not limited to):HVAC systems (Hydronic pumps Make-Up Air Units, packaged HVAC Units, terminal units, fans and vents, andmini-split air conditioning units)HVAC Controls Systems to include BAS/BMS interface equipment.Lighting control system and occupancy sensor interface with the BAS system.Domestic hot water heaters and recirculating pumps.Test and inspect the work identified above to ensure the work conforms to the construction contract documents andapplicable codes, industry standards for material and workmanship.2. Refer to project specification Section 01 9100 Commissioning General Requirements for additional requirementsincluding, but not limited to: Commissioning for Plumbing Commissioning for HVAC, controls, TAB Commissioning for Electrical3. Prepare a Commissioning Plan for the systems to be commissioned beginning with systems design performancethresholds and success criteria per the design documents issued for construction. Criteria to be reviewed andconfirmed in writing by the Designer of Record.