The work for this project consists of approximately 2,500 LF of street improvement, 1,000 LF of retaining wall construction, 2,000 LF of new storm sewer installation, 3,200 LF of watermain replacement/extension work, and 2,000 LF of landscaping. The work will be accomplished in 2025. In general, the project will be constructed within an urban area with limited right of way and the requirement to maintain traffic through the work area. Landscaping will provide aesthetics as well as slope stability either side of Classic, including a vegetative strip between the Classic Street and the sidewalk. There will be traffic calming measures on Classic Street, including speedbumps, pavement markings, signage and reconstruction of the northeast corner at Laneda to make it ADA compliant for a north south crossing. These elements are not included in the SB 1530 funding package but are anticipated to be paid for by City. These elements may be value engineered out if costs exceed available City funds. The elements of work include, but are not limited to: 1. Installation of water main and appurtenances. 2. Installation of storm drainage including storm pipe, manholes and catch basins. 3. Construction of curbs. 4. Construction of retaining walls. 5. Installation of guardrail. 6. Roadway reconstruction and paving. 7. Landscaping