I-84: Farewell Bend – N. Fork Jacobsen Gulch Section of the Old Oregon Trail & Huntington Highways (Rt. No. I-84 & US30) beginning near Huntington. FAP No. SA00(600). (Over $ 30,000,000). Req. approx. 1,700 ft2 temp. signs; 2 ea seq. arr. signs; 7 ea PCMS; 2 ea rdr. spd. trlr.; 200 hrs flag.; 2 ea AFAD; 20 ea temp. delin.; 283,750 ft temp. striping; 19,423 ft temp. barr.; 7 ea temp. imp. atten.; const. & rem. temp. rdbd. & surf.; 188 ft sed. barr.; const. surv. wrk.; 59,700 ft asph. pvmt. sawcut.; 200 yd3 found. exc.; 2,980 yd3 exc.; 2,512 yd3 st. emb.; 1,209 yd2 geot.; 74 yd3 riprap; 394 ft vid. insp.; 394 ft pipe; 7,000 ft dr. curb; 34 ea adj. inlets; 16 yd2 tr. resurf.; temp. wrk acc. & contain.; br. rem. wrk.; 260 yd2 br. appr. sl. CPPR; 69 yd2 cl. 2 prep.; 350 yd3 str. exc.; 170 yd3 gran. str. bkfl.; 20,469 ft2 penetrat. conc. seal.; 40 ft inject & seal crk.; 20,469 ft2 conc. & crk. seal.; 337 yd2 surf. text.; 14 ft2 conc. rep.; 390 yd2 reinf. conc. br. appr. slabs; 97 ft br. appr. sleep. slabs; 63 ft3 elas. conc. nos. mtl.; 324 ft2 const. elas. conc. nos.; 517 ft precom. Foam sil. jt. seal; 267 ft ctrl. jt.; 95 ft conc. rail; 511 ft rect. tube retro.; 1,275 ft2 conc. sl. pav.; 4 ea br. ID mrkr.; 1,481 ft2 br. rail sil. seal.; recon. extg. rdwy.; 590,380 yd2 CPPR; 8,500 yd2 2nd CPPR; 84,300 yd2 AMG CPPR; 1,720 ton aggr. base; 3,000 ton aggr. shldr.; 300 ton emuls. asph.; 109,000 ton ACP (950 ton PG 64-28; 5,600 ton PG 70-28ER); 59,000 ft crk. seal.; 2,200 yd2 ACP rep.; 17 ea asph. appr.; 84,531 yd2 contin. reinf. conc. pvmt.; 156 ft term. anch.; 52 ft term. exp. jt.; 560 ft conc. curbs; 14,638 ft gd. rl.; 560 ft cab. barr.; 35,500 ft adj. gd. rl.; 492 ft conc. barrr.; 16,708 ft rem. & reins. conc. barr.; 1,840 ea delin.; 51 miles rmbl. strips; 429,300 ft plur. comp. striping; 16,708 ft barr. sil. seal.; 10.5 yd3 conc. in sign sup.; 5,520 lb st. in sign sup.; 175 ft2 signs; pole found.; lumin., lamps, & ball.; swtch., cond., & wir.; light. poles & arms; telecom. mtrl.; telecom. install.; telecom. spl. & test.; 1 ea ATR; 6 ea elec. sys. install.; 16 ft sig. sup. drill. shft.; cam. poles & found.; 1 acre seeding; 3,600 ft fence. Completion Time: September 30, 2027. Classes of Work: either A) Asphalt Concrete Paving and Oiling, or B) Portland Cement Concrete Paving.