Scope of Work: Perform a seismic evaluation of the building, per American Society of Civil Engineers (“ASCE”) Standard 41-17 “Seismic Evaluation of Existing Buildings”. Develop rehabilitation and mitigation strategies per ASCE Standard 41-17 and the 2022 Oregon Structural Specialty Code (“OSSC”). It is the wish of the District to rehabilitate the building to meet the rehabilitation objective of “Immediate Occupancy”. Based on research and evaluation efforts performed during the Seismic Rehabilitation Grant (“SRG”) in preparation for the project, the structural improvements listed in the enclosed evaluation report should be considered for the existing structure. Preliminary rehabilitation drawings (enclosed) were prepared to assist in defining the necessary scope of potential rehabilitation work for this structure. The scope of work also includes the following services: Develop all construction documents for the project required for a CM/GC or hard bid construction delivery methods. Assist the District in the selection process for a CM/GC firm if CM/GC is selected as the method of delivery. The selection process will include the preparation and administration of the “Facts and Findings Report” and the “RFP” for the proposed alternative contracting method as outlined in the OAR 137-049-0600. Assist the District with the entitlement of the projects through the Authorities Having Jurisdiction and the State Historical Preservation Office. Provide all construction administration services necessary for the implementation of the projects. Services include but are not limited to: Administering project logs, RFI administration, manages progress meetings, submittal review, change order review and verification of certified pay requests. Assist District Staff with SRG reporting requirements for the project as required.