Specifications include, but are not limited to: Remove drywall from north side of entry vestibule. Frame and install Interbank® T-2 24”X36” Level III transaction window (or approved equal). Top surface of transaction counter must not exceed 34 inches from the floor surface. Cover framing with ARMORTEX® Level III composite panels (or approved equal). Install ½” drywall over panels and finish/paint matching existing. (See Attached Drawings) Install 1 110 VAC outlet 8-feet from floor surface on vestibule wall for future monitor. Remove windows from receiving office south wall. Frame and install Interbank® QS-T4a 48”x36” Level III transaction window (or approved equal). Cover framing with ARMORTEX® Level III composite panels (or approved equal). Install ½” drywall over panels and finish/paint matching existing. (See Attached Drawings) Install (12) blue strobes, at specified locations, that are activated by existing duress system. The duress system currently is incorporated into Lenel system box, located in control room.