Specifications include, but are not limited to:The scope of services includes: Primary Scope: LEEDv3 Fundamental & Enhanced Commissioning (per current City requirements Add-Alternate #1: LEEDv4 Additional Commissioning Additional Items Add-Alternate #2: Additional WELL Commissioning not already covered. Assistance to DBR for LEED accreditation during design. Systems to be commissioned include: • All HVAC Equipment & Systems o Controls o VRF (Variable Refrigerant Flow) system • VFD’s (Variable Frequency Drive) • Audio Visual System • Plug Load Management • Lighting Vacancy Sensors • Scheduled or occupancy sensor lighting controls • Daylight dimming controls • Emergency power systems • Security systems • Life safety systems (fire alarm, egress lighting, fire protection) • Plumbing systems • Access control system and integration with ADA operators • Central building automation systems, including linkages to remote monitoring and control sites (this excludes any security-related control systems or interlocks). • All equipment of the heating, ventilating and air conditioning systems. • Central plant systems (boilers, chillers, pumps, etc.). • Domestic and process water pumping systems. • Lighting control systems. • Public address system. • Other systems specific to project and program